ACx601变频器/ACx604模块单元在用户自定义柜体中的安装,适当的计划能够减小额外的工作量,比如附加的设备适合稍后安装上。下列是包括在安装之前考虑最重要的方面的检查清单:
□主电网的类型(接地或者浮地)
□柜体结构和运行的环境条件
□电缆
□进线滤波器
□用于690V单元的du/dt滤波器
□输入熔断器,主电供电关断装置
□CDP 31x控制盘位置与安装
□其它附加设备。
ndustrial” CAN I/0 Bus
o
Open CAN -Bus,up to 1 MBd
o
Foundation Fieldbus H1
up to 31. 25KBd
Foundation Fieldbus H2 (fast Ethernet)
HART
The system allows different types of field buses to be mixed and run simultaneously in the same field controller PS.
Industrial “field control explosion (AC800F) consists of the following components:
Basic unit pm802f
Power supply sa801f/sd802f
o
Ethernet network card ei801f/ei802f/ei803f
o
Fieldbus interface card fi810f/fi820f/fi830f
Various accessories
The main components of the field controller PS are described below.
Basic unit pm802f
The basic unit pm802f is composed of a metal rack and a CPU motherboard. It periodically scans the data from the
The signals of the field bus sensors are processed according to the control application program configured by the user, and then the calculation results are passed
The fieldbus interface card returns the corresponding fieldbus actuator.
Two field controllers can realize controller 1:1 redundancy, and undisturbed switching between master and slave PS. Two on each PS
Ethernet network card, the second network card is used to connect the system network diginets), and the second network cards can be interconnected with each other to form a special
Redundant communication link (diginetr) to ensure information synchronization between master and slave PS. — However, the master PS fails, and the slave PS can quickly and undisturbed connect the replacement worker
Make. All inputs and outputs also support redundant operation.
The data communication between the field process controller PS. operating station 0s and the engineer station es is completed by the system network (diginets), which is inserted
The – Ethernet network card on the PS basic unit provides the interface between PS and diginets. ES. Hardware configuration and PS
The user program is downloaded to the PS CPU through diginets and the first network card. After the field bus interface card is newly installed or replaced, the required group
The status information will be automatically reloaded. The